Testing and qualifications
To get reliable technology and tools, our engineers have all equipment and systems available to perform testing and qualifications.
Almost 20% of our floor plan is dedicated to perform testing, including our 7x5x5m test pool (5m water dept). Our workshop has several stations where pull test can be performed up to 32 ton, and one station up to 300 ton. Testing and qualification can be bought as a separate service.
Test equipment can also be manufactured at Depro.