Competence & Capabilities
Project management
In house:
- Project Managers
- Project Planners
- Procurement Managers
- HSE & QA Managers
Systems in use:
- SAP B1
- SharePoint, Office 365
- Variatec, Proark
Engineering
In house:
- Engineers
- Mechanical
- Hydraulical
- Electrical
Systems in use:
- Variatec, Proark
- Inventor, Ansys
- Solid Works
Workshop
Electrical Clean Room – 100 m2
Machining area – 500 m2:
- 7 CNC operated machines
Assembly area – 3 000 m2:
- 5 overhead cranes
Max load 32 ton
Test area – 230 m2:
- Test pool – size; 5x5x7,5 m
Storage area – 800 m2
Product cleaning area – 100 m2
Pressure test bunkers – 100 + 190 m2
Welding area – 100 m2
Testing
In house:
- Water test pool 5 x 5 x 7,5 meter
- Pull test 32 ton
- Pressure testing up to 2,2k BAR, 4 HPU`s located within separate testing bunker
Options:
- Pull test 1000 ton
- Pull test from test pool 360 ton